Exterior paint in this country is not decoration. It is the layer keeping wind-driven rain out of your render, and when it fails the wall behind it starts holding water.
Most of the work is preparation. The painting is the quick part.
Dirt, algae and chalked-off old paint come off first. Paint applied over that is just a coloured layer sitting on loose material.
Hairline cracks get opened and filled, and blown or hollow render gets flagged before anything is painted over it.
Flaking paint removed back to something sound, and chalky render sealed so the new coat has something to grip.
Windows, doors, gutters and planting covered before a brush is lifted.
A breathable exterior masonry coating, applied at the correct spread rate rather than thinned out to cover more wall.
Timber and uPVC trim prepared and coated to match or contrast, whichever the house wants.
Same treatment, quoted with the house or on their own.
Photos to start, then a proper walk round.
How sound the render is decides how much preparation the job needs, and that is most of the cost.
Preparation, materials and painting broken out, plus any render repair listed separately so you can see it.
We will bring options and give an opinion if you want one.
Washing, filling, scraping, masking. The unglamorous days.
Coats applied in suitable weather, masking removed, everything taken away with us.

All Seasons Home Improvements: fifteen years working on the outside of Irish houses, based in Longford, fully insured.
Clear about the scope: exterior painting is not covered by the 10-year guarantee that applies to roof repairs and dry verge systems. Paint life depends on the surface underneath, the exposure of the wall and the weather it gets, and no honest painter puts a decade on it.
What you get instead is honesty about preparation. If the render needs work before it is worth painting, we will say so, even though it makes the quote bigger and the sale harder. Painting over a wall that is holding water just hides it for a season.
Late spring through early autumn, in a settled dry spell. The surface has to be dry going on and the coating needs time to cure.
It depends on the surface and how exposed the wall is. A well-prepared, properly coated wall lasts a good deal longer than a badly prepared one, which is where the preparation argument comes from.
Yes. Soffits, fascias and barge boards are usually done at the same time, since the access is already there.
Usually close enough that nobody could tell, though weathered paint has drifted from whatever it started as. We will show you options against the wall.
Most two-storey houses are done off ladders and towers. If a particular elevation genuinely needs scaffold, it is in the written quote up front, not added later.
Yes. Masking and protection are part of the job.
Either. Plenty of houses have one exposed elevation that has weathered far worse than the rest, and there is no requirement to do all four. It is quoted per elevation so you can see what each one costs before you decide.

Tarmac and paving washed back to clean, then resprayed and sealed. Patching, not relaying.
Learn more
Leaks, slipped slates, cracked flashing and storm damage put right, usually within days.
Learn more
Moss, algae and lichen stripped back, then a protective coating that keeps it off.
Learn moreFree written quote, preparation and painting broken out separately. Longford and the surrounding counties.